Product Detail :
|
Hubballi Division SW-I) W Beam metal barrier fencing along the track for a total
length of 2.7 Km HUBBALLI-GADAG (UBL-GDG) section. SW-II) W Beam metal
barrier fencing along the track for a total length of 2.6 Km GADAG-BADAMI(GDG-
BDM) section.(MAINTENANCE PERIOD-12MONTHS)
|
Tender Detail : |
Hubballi Division: SW-I) W Beam metal barrier fencing along the track for a total
length of 2.7 Km HUBBALLI-GADAG (UBL-GDG) section. SW-II) W Beam metal
barrier fencing along the track for a total length of 2.6 Km GADAG-BADAMI(GDG-
BDM) section.(MAINTENANCE PERIOD-12MONTHS) |