Product Detail :
|
Establishing 2x20 MVA, 110/11kV sub-station at Rajeev Grama & Construction of 110kV DC Line from existing 110/33/11kV Shiggaon sub-station to proposed 110/11kV Rajeev Grama sub-station using Panther conductor for a distance of about 9.874kms near Konanakeri Village along with Construction of 110kV Terminal Bays at existing 110/33/11kV Shiggaon sub-station in Shiggaon Taluk & Haveri District. Upgradation of existing 2x5MVA, 33/11 kV sub-station to 2X20 MVA, 110/11kV sub-station at Mudenur and construction of 110kV DC line using Panther conductor from 110/33/11kV Tumminakatte Sub-station to proposed 110/11kV Mudenur Substation for a distance of 15.656kms along with construction of 2 nos. of 110kV terminal bays at existing 110/33/11 kV Tumminakatte sub-station in Ranebennur Taluk, Haveri District. Establishing 2X20 MVA, 110/11kV sub-station at Chalageri and construction of 110kV DC line from existing 110/11kV Aremallapura Substation to proposed 110/11kV Challageri substation using panther conductor for a distance of 18.169kms along with construction of 2 nos of 110kV terminal bays at existing110/11kV Aremallapura sub-station in Ranebennur Taluk, Haveri District. Establishing 2x20MVA, 110/11 kV substation at Nittur and construction of 110kV LILO line using Lynx conductor from on going 110kV Tiluvalli-Hunsabhavi SC line to proposed 110/11kV Nittur substation for a distance of 5.013km in Hirekerur Taluk, Haveri District on Partial Turnkey Basis including Supply of all Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning. Combined Package for Work A- Estab. 110kV S/s at Rajeevgrama and constr. of 110kV line-9.87km, Work B- Up gr. 110kV S/s at Mudenur and constr. of 110kV line 15.656km, Work C - Estab. 110kV S/s at Chalageri and constr. of 110kV line- 18.169km, Work D- Estab. 110kV S/s at Nittur and constr.110kV line-5.013km on Partial Turnkey Basis.
|
| Tender Detail : |
Combined Package for Work A- Estab. 110kv S/s at Rajeevgrama and Constr. of 110kv Line-9.87km, Work B- Up Gr. 110kv S/s at Mudenur and Constr. of 110kv Line 15.656km, Work C - Estab. 110kv S/s at Chalageri and Constr. of 110kv Line- 18.169km, Work D- Estab. 110kv S/s at Nittur and Constr.110kv Line-5.013km on Partial Turnkey Basis |