|
Product Detail :
|
Hubballi Division SW-I-Lachhyan-Tadwal (LHN-TVL)section Cess work and
provision of side drain and toe wall in the approach of Bhima bridge. SW-IIA-
Lachhyan-Tadwal (LHN-TVL) Section Pre-cast drain between track in approach of
Bhima bridge (Lachhyan end) for a length of 1.3km. SW-IIB-Kudagi-Mulvad(KDGI-
MVD) Section Pre-cast drain for a length of 0.4km and RCC drain for a length of
0.6km (Maintenance Period12 Months)
|
| Tender Detail : |
Hubballi Division: SW-I:-Lachhyan-Tadwal (LHN-TVL)section: Cess work and
provision of side drain and toe wall in the approach of Bhima bridge. SW-IIA:-
Lachhyan-Tadwal (LHN-TVL) Section: Pre-cast drain between track in approach of
Bhima bridge (Lachhyan end) for a length of 1.3km. SW-IIB:-Kudagi-Mulvad(KDGI-
MVD) Section: Pre-cast drain for a length of 0.4km and RCC drain for a length of
0.6km (Maintenance Period:12 Months) |