Product Detail :
|
The project involves the establishment of two substations, each with a capacity of 2x20 MVA at specified locations. This includes the installation of 66/11 kV substations and the laying of 66 kV underground cables, ensuring connectivity between existing lines and the new substations. Substation equipment, underground cables, mandatory spares, civil works
|
| Tender Detail : |
The project involves the establishment of two substations, each with a capacity of 2x20 MVA at specified locations. This includes the installation of 66/11 kV substations and the laying of 66 kV underground cables, ensuring connectivity between existing lines and the new substations. |