Product Detail :
|
Proposed new bridge at rly km 58/025 between makalidurga (mkl) - thondebhavi (tdv) stations deposit work for yettinahole water pipe line (2.30m id) crossing size of 1x4.40mx3.75m rcc box by rolling in /launching method. maintenance period is 6months.
|
Tender Detail : |
Bypl-dmm Section: Proposed New Bridge at Rly Km 58/025 Betwe...... |