Product Detail :
|
Preparation of Feasibility study report for construction as Double Decker (Flyover cum Metro) for (i) Corridor-1 from JP Nagar 4th Phase to Hebbal of 29.20 Km length (CH0.400 Km to CH29.600 Km) (approx.) of Phase-3, (ii) Corridor-2 from Hosahalli to Kadabagere of 11.45 Km length (CH0.600Km to CH12.050 Km)(approx.) of Phase-3 and (iii) From Sarjapur to Ibbalur (ORR Junction) of 14 Km length (CH0.500 Km to 14.500 Km) (approx.) and from Agara to Koramangala 3rd Block of 2.45Km length (CH16.900 Km to CH 19.350 Km) (approx.) in Phase-3A Corridor of Bangalore Metro Rail Project.
|