Product Detail :
|
Strengthening of Bridges From Km.40.000 to Km.86.400 By Providing Pitching, Flooring, Drop Wall, Steps, , ballast Retainer Etc (total 80 No. of Bridges) Mys-y Section Ancilliary Works to Wing Wall, Retaining Wall, Side Drain and Approach Road at Sw-ii-lhrub No.741 B at Km. 131/300-4000 Between Mys-nhy Stations in Aden/mys Sub-division Sw-iii- Mys-cmnr Section Ancilliary Works to Wing Wall, Retaining Wall, Side Drain and Approach Road at Lhrub No.841 a at Km. 58/400-500 Between Ntw-cmnr Stations in Aden/mys Sub-division.
|